Compliance Testing for Residential Developments
24-Hour Guarantee* — Results, or It's Free

One failed test can cost you the handover date.

We test on-site and turn certs around in 24 hours — before it becomes your problem.

Airtightness · Ventilation validation · Acoustic testing (24-hour guarantee) · BER assessments

Why Forsah is the right fit for your development.

A personal introduction from Sean Collins, Forsah's Commercial Director.

How We Work With You

A partner across the development — not just a test on the day.

From the first unit tested to the last certificate delivered, here's what working with Forsah actually includes.

Airtightness, VV & Acoustic

24-Hour Turnaround*

Certified results delivered within 24 hours of testing — or the test is free.

See how it works ↓
Free, First Unit

Benchmark Report

We test your first completed unit against Part L, E and F before the rest of the site follows the same spec.

See the Benchmark Report ↓
Proven

Proven Track Record

Tested at scale across live developments — see the projects, units and status for yourself.

See the track record ↓
One Provider

Full Testing Suite

Airtightness, ventilation validation and acoustic testing (24-hour turnaround), plus BER assessments — the full compliance picture, one provider.

How our 24-hour turnaround works*

A visible process, not just a promise.

Forsah built its own on-site app so certificate delays don't hold up your sign-off. Here's exactly what happens after a test is carried out — step by step.

STEP 1

Test carried out on site

Testing completed on schedule.

STEP 2

Data captured instantly

Data transferred immediately via our specially developed Forsah testing app to the quality team.

STEP 3

Reviewed by our quality team

Every test result is fully verified by the in house Forsah quality engineers.

STEP 4

Certificate delivered

Within 24 hours of testing, certificates received via email or directly to your PM system.

Built in-house — because off-the-shelf tools couldn't guarantee this.

Every Forsah technician tests on our own purpose-built app, not a generic form or a paper site sheet. It's the only reason the 24-hour guarantee is possible at all.

  • Test data captured and validated on-site, in real time
  • Results synced instantly to our quality team — no paperwork, no re-entry, no delay
  • Every certificate tracked digitally from test to delivery
Proof, not promises

Tested at scale, on real developments.

Track record matters more than claims when hundreds of units and multiple phases are on the line. Here's what Forsah has already delivered.

Forsah on-site at a live residential development
ProjectLocationDeveloperUnitsStatus
BennetstownDunboyne, Co. MeathGlenveagh Homes578Ongoing
Slí na hAbhannBallymoneen Road, GalwayCairn Homes143Ongoing
The FurrowsJamestown, Ratoath, Co. MeathGlenveagh Homes128Ongoing
Chapel ParkKinnegad, Co. WestmeathMoylough Developments (Corcom)127Ongoing
CapamiDublin Road, Celbridge, Co. KildareCapami44Ongoing
Lios na CirceSaleen, Castlebar, Co. MayoMayo County Council (Contractor: LPB)37Ongoing
Limetree GroveCashel, Co. TipperarySMJ Developments36Ongoing
Spencer LaneRathangan, Co. KildareAF Construction25Ongoing
Captain's PlaceCrumlin, Dublin 12Mourneview Construction14Ongoing
KilmartinTyrellstown, Dublin 15Glenveagh Homes147Completed
An TobarRahoon, GalwayCairn Homes140Completed
The RowansOld Cork Road, Bandon, Co. CorkCastlerock Homes68Ongoing
The DairyfieldsFerrybank, Co. WexfordApple Tree Homes191Ongoing
Garraí na SailíLetteragh Road, GalwayBurkeway Homes82Ongoing
Radharc na CarraigeGlencarrick, Roscrea, Co. TipperaryCoolsivna Construction47Completed
Forsah Benchmark Report™

Test your first unit — free of charge — before the rest of the site follows the same spec.

Most compliance issues aren't one-offs — they're a spec problem that gets built into every unit on site before anyone catches it. The Benchmark Report gets ahead of that. We assess your first completed house against Part L, Part E and Part F requirements, at no cost, so you know exactly where you stand before dozens or hundreds of remaining units are built to the same detail.

  • Carried out on the first completed house or unit of your development, before the rest of the site follows the same detail
  • Benchmarked against Part L, Part E and Part F requirements
  • Compared against similar developments Forsah has already tested, so you know where real risk tends to hide
  • Flags any compliance risk while it's still one unit's problem, not a whole site's problem
1

You complete your first unit

Built to your standard spec, ready for its first compliance check.

2

We benchmark it, free of charge

Assessed against Part L, Part E, Part F and comparable schemes Forsah has tested.

3

You get a clear read before scaling up

Fix it once on unit one — not after it's been repeated across the whole site.

Talk To Us

Two ways to get started — pick whichever suits.

Book 15 minutes to talk through your development directly, or request a proposal and we'll come back to you.

Request a Proposal

Tell us about your development and we'll come back with a tailored proposal.

Something went wrong sending this — please try again, or call us on 087 692 8114.

We'll get back to you within one working day.

Thanks — that's on its way to us.

We'll come back to you within one working day with next steps.

or

Book a Meeting

Pick a time to talk it through directly — 15 minutes, no obligation.

Building control shouldn't be the thing that keeps you up at night.

Contact Us